Aspen Goes To Spain
Tue 5th Aug 08
Aspen Cooling Cool Super Yacht
Aspen Cooling replaced the air conditioning on super yacht 'CARLEY' in Palma-de-Mallorca
As part of a €300.000 Euro refit, Aspen were contracted to replace the Cooling/Heating system on the super yacht. Two Cruisair Reverse Cycle MTC120EC, 120,000Btu (35Kw) and 20 CBBL air handling units were used. Aspen engineers carried out the re-fit in seven days, allowing the yacht to be re-commissioned and used by the owners.
News Stories
- R22 Phase out What effect will it have on your buisness
- Aspens Expansion in The Refrigeration Sector Continues to Grow
- Aspen Cooling Ltd Obtain Full Company F-Gas Certification.
- Aspen replaces chiller for Holiday Inn at (Reading West)
- Employee of the Quarter Maidstone Based Engineer Gareth Coulter
- Aspen's Continued Expansion
- Aspen Goes To Spain
- Employee of the Quarter London Based Engineer Damion Tulloch
- Mandatory inspections are being introduced for all air-conditioning systems with rated cooling output greater than 12kW.
- Aspens Expansion in The Refrigeration Sector Continues
